Connect with us

Colorado Springs

The Southwest Downtown Pedestrian Bridge is being put into place today! The icon…

The Southwest Downtown Pedestrian Bridge is being put into place today! The iconic 250- foot bridge will connect America the Beautiful Park with downtown Colorado Springs. Visit the Olympic City USA Facebook page to watch a live stream as crews hoist the bridge into the air, drive it across the railroad and place onto its abutments in a carefully orchestrated effort.

On-site work will continue through the winter before the bridge opens to the public in early 2021, weather and construction dependent.

[image description: bridge suspended in the air before being put into place. a large crane is in the background. The sky is still somewhat dark in the early morning hours.]

State News

National News

International News

Sports

Trending

Share via
Copy link
Powered by Social Snap